FPZ SCL R- MD MOR IE2 Serie Manual De Usuario página 45

Ocultar thumbs Ver también para SCL R- MD MOR IE2 Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 64
F
G
G
G
Abnormal vibration
F
G
G
G
Fluid leakage
G
G
FPZ-MI-R-MD-MOR-GOR-IE2-15-R03
Unit installation position unsuitable.
The impeller is damaged.
The impeller has accumulated deposits.
Unit fixed without vibration dampers.
Rigid connection to the system
Worn transmission coupling
Faulty bearing on blower side or motor side.
Faulty gaskets on the silencer.
Faulty gaskets on the cover (if present).
Worn sliding sealing ring
Have the units installed on structures that cannot transmit
or amplify the noise (tanks, metal plates, etc.) by the
Technician.
Have the impeller replaced by FPZ After-Sales Service.
Have the unit cleaned inside by FPZ After-Sales Service.
Have the unit secured with vibration dampers by the
Technician.
Have flexible sleeves installed between the unit and the
pipes by the Technician.
Have the transmission coupling replaced by FPZ After-
Sales Service.
Have the bearing replaced by FPZ After-Sales Service.
Have the gaskets checked and, if necessary, replaced by
FPZ After-Sales Service.
Have the gaskets checked and, if necessary, replaced by
FPZ After-Sales Service.
Have the gaskets checked and, if necessary, replaced by
FPZ After-Sales Service.
45 / 119
Tabla de contenido
loading

Este manual también es adecuado para:

Scl r- md gor ie2 serieScl r-20 md mor ie2Scl r-30 md mor ie2Scl r-40 md mor ie2Scl r-20 md gor ie2Scl r-30 md gor ie2 ... Mostrar todo

Tabla de contenido