SNOWJOE iON100V-24SB-CT Manual Del Usuario página 12

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Assembling the Handles
1. Slightly spread the upper handle assembly down over the
lower handle until it fit in the position (Fig. 8).
Fig. 8
Upper
handle
assembly
Handle
knob +
bolt
2. Adjust upper handle assembly to the optimal position by
aligning the double bolt holes at the desired height. Secure
the connection using the 4 handle knobs and bolts, and
tighten on each side (Fig. 9).
Fig. 9
2
1
2-position handle
height adjustment
Discharge Chute Assembly
1. Place the discharge chute assembly onto the gear plate,
and push down until the chute is flush and flat against the
housing (Fig. 10).
Fig. 10
Discharge
chute assembly
Gear plate
Lower
handle
2. With the holes on the discharge chute pole aligned with
the holes on the housing, use the 12 mm open end wrench
to secure the 2 chute bolts with the discharge chute
assembly (Fig. 11).
Fig. 11
Discharge
chute pole
12 mm wrench end
3. Clip the cord clip onto the lower handle frame, insert the
discharge chute cable into the cord clip (Fig. 12).
Fig. 12
Cord clip
Discharge
chute cable
12
Chute bolts
Tabla de contenido
loading

Tabla de contenido