Operation
Highlight and
select "New riser"
Riser name can be changed if desired
Select "Create riser"
Confirm
The new riser is added to the projects list.
5.3 Flow Measurement ("Hydr.
balancing")
Used to mark measuring data for printing or saving.
Operation
Return to main screen without
tagging data
Tag data and return to main
screen
Only tagged data is printed when print function is used or
saved when save function is used.
5.4 Temperature Measurement
Used to store temperature measurements into data fields. At
least one temperature sensor is required which can be
connected to either port T
or T
1
•
"T
b. B." – supply temperature before balancing
Supply
•
"T
b. B." – return temperature before balancing
Return
•
"T
a. B." – supply temperature after balancing
Supply
•
"T
a. B." – return temperature after balancing
Return
Actual measuring value of temperature sensor can be stored
in any data field. Data already present is overwritten.
The screen shows the following information:
•
Top row (first line): actual value of T
•
Rows below (second to fifth line): four data fields
mentioned above
How to store actual temperature in a data field:
Operation
Highlight data field
Assign temperature T1 to data
field
Assign temperature T2 to data
field
Highlight "Accept" to return to main menu:
Operation
Return to main menu without
tagging data
Return to main menu with data
tagged
Command Key
OK
UP/
È
DOWN /
ON
UP/
È
DOWN
OK
ON
Command Key
ESC
ESC
OK
ON
. Available data fields are:
2
and T
1
2
Command Key
UP/
È
DOWN
T
ESC
1
T
ON
2
Command
Key
RETURN
ESC
OK
ON
GB
Data is saved in any case, no matter which option is selected.
Tagged data is flagged by a check mark next to menu item in
main menu.
Tagged data can be printed using print function or saved
using Save function (see below). Any unsaved data is lost
when the BasicMes-2 is switched off.
5.5 Leakage Test
Used to set parameters and start a leakage test. The screen
shows the following four options:
•
"Start test" – start test or return to main menu,
•
"Test press." – test pressure which should be held,
•
"Stab. time" – duration of stabilisation time, and
•
"Test time" – duration of actual leakage test time, with
following options:
Operation
Return to main menu without
starting the test
Select data field
Change data
The test consists of three parts:
•
Switch on and/or set pump speed
•
Stabilisation period indicated by a countdown clock
•
Leakage test during which a graph is drawn
Operation
Confirm that pump has been
switched on and set to correct
speed
Override stabilisation period
and start leakage test
Finish leakage test
Abort test at any stage
5.6 Data Logging
Used for programming and start of longterm data logs with the
following options:
•
"Start recording" – starts data logging
•
"Interval" – defines at which interval a measurement is
done. Minimum is 1s, maximum is 23h 59m 59s
•
"Measurings" – defines how many measurements
should be done altogether. Minimum is 1, maximum is
9,999
•
"Display" – defines if display should be switched on or
off during logging
•
"Stop date" and "Stop time" – informs when data
logging is finished
To change a value:
8
Command Key
ESC
ESC
UP/
È
DOWN
ON
Æ
Command Key
PROCEED
ON
PROCEED
ON
FINISH
ON
ESC
ESC
MU2H-2323GE25 R0620