All manuals and user guides at all-guides.com
VIERLING
LED ADSL Test blinks rapidly:
ADSL-initialization with DSLAM is in progress. This means that
synchronization and training phases are taking place in accord with ITU
G.992.1 (second phase of the ADSL-connection set-up).
LED ADSL Test remains lighted:
Synchronization with DSLAM has been successfully concluded. This
means that the ADSL connection and the ATM-layer have been
established. If this status is maintained (i.e. an immediate re-
synchronization or blinking of the LED does not take place), then the
ADSL Test has been successfully completed.
VIT-A1 - 70299.202 - 1.3 – 20050513
33