9
Pop out the first wiring access slug. Use second if needed.
For New Construction - attaching to joist go to step A11, page 5
For New Construction - suspended between joists go to step B11, page 8
For Existing Construction - accessible from above go to step C11, page 11
For Existing Construction - accessible only from below go to step D11, page 15
New Construction - attaching to joist
A11
5/8
1/2
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
41943-01 1/13/2006
All manuals and user guides at all-guides.com
E
Choose Installation Option
E
5/8
1/2
10
Insert the strain relief (not included) into the housing and
secure with washer.
A12
Screw pre-loaded screws into joist or framing.
C
B
5