USE
1
Pull down the adjusting ring.
3
Make sure the ring table indicates the
expected torque number, release the
adjusting ring.
NOTE
Hold the torque wrench in
the middle of the handle.
BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
2
Keep the ring down and rotate the ring to the
expected torque number according to the
4
Slowly turn the screw connection in the
If the trigger signal sounds (click), the
Operate the torque wrench
vertically.
Tel.: 02196 720480
Fax.: 02196 7204820
scale.
fastening direction.
fastening process must be ended
immediately.
Insert the insertion tool
correctly into the square,
making sure that the socket
and torque wrench are
correctly aligned when
working.
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed