LF Harbor Breeze GAT24BNK6L Manual Del Usuario página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INITIAL INSTALLATION
8. Slip downrod (A) into motor housing yoke, align
holes and re-install pin (L) and clip (M). Tighten
set screws in motor housing yoke and then tighten
preassembled nut on one of the set screws. Then,
slide yoke cover (E) down until it rests on top of
motor housing (D).
9.
Depending on the length of downrod you use, you
may need to cut the lead wires back to simplify
the wiring. If you decide to cut back the lead
wires, it is suggested you do so in the following
manner:
Take the lead wires and make sure you have
pulled them all the way through the top of the
downrod. Start at the TOP of the hanging ball on
the downrod and measure 8 in. of lead wire, then
cut the excess wire off with wire cutters (not
included).
NOTE: If you do not cut back the lead wires,
Steps 9 and 10 are not necessary and you may
proceed to Step 11 instead.
If you decided to cut back the lead wires in Step 8,
10.
strip 1/2 in. of insulation from end of each wire --
white, black, green and blue (if applicable). Twist
stripped ends of each strand of wire within the
insulation with pliers (not included).
8
M
M
D
9
10
9
A
E
L
Set Screw
and Nut
8 in.
L
Yoke
Hanging
Ball

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

2599783

Tabla de contenido