Ascaso BARCELONA BIG DREAM Plus Manual De Instalación página 3

Idiomas disponibles

Idiomas disponibles

Next, when you see water coming out of the mini purge valves in the upper part of the group
into the drainage bowl, you can close the valves as at this point the groups will be saturated
without any air inside them.
Then click 'Next'.
7.
During this step, the steam boiler will start filling automatically.
When the steam boiler has filled up to its working level, a new information display will appear.
Click 'Next' and the groups and boiler will start heating up.
When the LEDs on the button pad stop flashing and remain fixed, you can start using the
machine.
3
loading

Este manual también es adecuado para:

Barcelona big dream one