Maintenance
Procedure:
1
• Drain the chamber by using
the drain port.
5
• Clean the quartz sleeve with a
cloth soaked in CLR, vinegar
or some other mild acid and
then rinse with water.
Note: If sleeve cannot be
cleaned completely or it is
scratched or cracked, then
replace the sleeve.
Note: After replacing the UV lamp or quartz sleeve perform the disinfection procedure, refer to
11
2
3
2
1
• Remove the bottom retaining
nut, floating spring, and
O-ring.
6
Mild
Acid
• Reinstall the quartz sleeve in
the chamber allowing the
sleeve to protrude an equal
distance at both ends of the
chamber.
• Slide supplied O-rings onto
each end of the quartz
sleeve.
3
1
2
• Remove the top retaining nut
and O-ring.
7
2
1
1
2
3
• Reinstall the top and bottom
retaining nuts, floating spring,
and O-rings respectively.
• When service is complete,
assemble the prerequisites in
the reverse order of
disassembly.
• Plug in controller and verify
the POWER-ON LED display
is illuminated and controller
power-up sequence operates.
4
• Carefully, remove O-ring
adhering to the quartz sleeve.
• Remove the quartz sleeve.
8
1
2
click
• Push the lamp connector
against lamp connector base
together until an audible click
is heard.
• Re-pressurize the system to
check for leaks.
Section
3.2.