swissflex UNI 20-85RF Manual De Instrucciones página 24

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
The uni 20_85RF/uni 22_85RF bridge
work despite being switched on and all components
being connected properly
Disconnect the mains supply unit from the mains out-
let. Wait a minute and then reconnect it. If necessary,
connect a bedside lamp to check that mains voltage
(240 V) is present. If there is no current, check the fuse.
Press the "all motors down" button (7) to reset all ad-
justments. The control of the uni 20_85RF/uni 22_85RF
bridge
®
contains microprocessors, so irregular power
supply can lead to malfunctions.
The radio remote control does not work (The back-
ground light
does not work)
Insert new batteries. Where applicable, remove any
obstacles between the radio remote control and the
motor control.
After a power failure once power has been restored
to the system
To restart the initial setup of the uni 20_85RF/uni
22_85RF bridge
®
, press button (30) on the switching
power supply (28) until all of the motors have powered
down and this is confirmed by the motor's emergency
light blinking twice. (Can take 20 seconds).
Problem
Possible cause
Remote control
No mains supply.
or control system
Manual switch or control system
not working.
defective.
Control systems
Thermoswitch on the transformer
suddenly no
may have been triggered or may be
longer travel /
defective.
move.
Thermal cut-out in the transformer
may have been triggered or may be
defective.
Internal fuse may have been triggered
or may be defective.
No mains supply.
Supply line (mains and / or manual
switch / auxiliary control system) inter-
rupted.
The battery-
Block battery / block batteries flat.
operated electric
reset function
Block battery/batteries not connected.
cannot be acti-
vated.
24
Operating instructions
®
does not
Technical data
Supply voltage: 110-240 V
Remote control power supply: 3 x AAA Batteries
Power rating motors:
Intermittent operation FROM 2 min / 18 min
Power rating user socket : 2000 W / 10 A
Thrust motors: 2 x 6000 N
Power supply for emergency lowering:
2 x 9V block battery
Solution
Restore mains connection.
Contact your supplier / stockist.
Leave the control system in the rest position for 20-30
minutes.
Contact your supplier / stockist.
Contact your supplier / stockist.
Restore mains connection.
Check the supply line and restore contact if applicable.
Check and replace the block battery / block batteries if
necessary.
Connect the block battery / block batteries.
EN
Tabla de contenido
loading

Este manual también es adecuado para:

Uni 22-85rf bridge85rf85rf bridge

Tabla de contenido