Initial Rinse; Time/Counter Display; Forced Switching-On - Faema E91 Diplomat Manual

Tabla de contenido
English
4.

Initial rinse

!
“Before operating the machine, perform a rinse of the
internal circuits and change the water in the boiler.”
4.1
Changing the water in the internal groups circuits
Remove the filter carriers (43, 49) of the distributor groups.
Via the continuous distribution key (40), empty the water from each
group for approximately one minute. Repeat this operation twice.
4.2
Changing the water in the boiler
Ensure that the indication on the display corresponds to the working
pressure value.
Keep the hot water distributor key (51.1) pressed down for approximately
5 seconds.
The following message will be displayed: “water change”, followed by
an audio signal. The water from the boiler will drain from the hot water
nozzle (32).
All the other keys will be deactivated.
When only steam is issued from the nozzle (32), press the hot water
distributor key (51.1) again.
The machine will return to its normal functions and the boiler will be
refilled with water.
5.

Time/counter display

Under normal working conditions, the following message will be
displayed:
boiler pressure
1,00 bar
N.B.: The working pressure value (set by the installing technician) is
also shown by the switching off of the boiler heating element insertion
indicator light (44).
When the display reads “boiler pressure”, drinks are obtained by pressing
the keys coffee, cappuccino, hot water and milk.
When the PROG (35) key is pressed, the following message will be
displayed:
monday
6.

Forced switching-on

At the end of the programmed switch-on time the following message will
be displayed:
machine OFF
ON: press PROG
11:00
51.1
32
When the current day and time are displayed, drinks are obtained by
pressing the keys coffee, cappuccino, hot water and milk.
When the PROG (35) key is pressed, the following message will be
displayed:
number of selection
press a key
When the message “select counters” is displayed, if the select coffee,
cappuccino, hot water or milk keys are pressed, the number of times
that key has been pressed is displayed. The number of times each key
has been pressed is shown on the bottom line of the display.
N.B. To reset the various counters, access “programming” and follow
the procedure provided in Paragraph 5.
When the PROG (35) key is pressed, the message “boiler pressure” will
be again displayed.
When the machine needs to be used, keep the PROG (35) key pressed
down for 10 seconds.
The machine will again be activated for use.
To return to programmed switch-off, check the position of the mains
switch (12), turn it to position “0” and then to the previous position.
English
40

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

E91/a

Tabla de contenido