American Standard Elevate 2947SW T36 Manual Del Propietário página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

8
APPLICATION OF ADHESIVE, LEFT SIDE PANEL
Once Left Side Panel is correctly in position, remove the Left Side Panel and apply adhesive on the OSB
board around the outer edges in vertical lines with 6" spacings as illustrated. NOTE: Left Side Panel will use
approximately 1 tube of adhesive; if some remains after completing the application pattern, apply remaining
amounts on OSB in dollops until tube is empty. Reinstall the Left Side Panel back into position and snap into
place over the Righty Side Panel. When correctly snapped into position, screw Left Side Panel in place on the
top flange area into each stud using exterior rated wood screws.
NOTE: It may be necessary to apply bracing to the wall areas to ensure good contact. Wait 24 hours before
applying sealant to joint areas as noted in step 9 below.
9
APPLICATION OF SEALANT
After waiting 24 hours for adhesive to cure from step 8, remove any bracing that may have been installed and
apply sealant to all areas as illustrated. Allow 24 hours to cure before using.
VERTICAL LINES
6" SPACING
Tabla de contenido
loading

Este manual también es adecuado para:

2947sw t38

Tabla de contenido