American Standard Elevate 2947SW T36 Manual Del Propietário página 7

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5
FINAL DRY FIT
5a. Once the panels are dry fitted correctly in place with
no gaps, secure the bottom of each side panel
to the base with tape.
5b. Mark both Left and Right Wall Panel locations, so
when the Panels are removed for the addition of ad-
hesive on the OSB board, the panels can be returned
back to the same locations.
5c. Unscrew and remove both Left and Right Panels.
6
APPLICATION OF ADHESIVE, RIGHT SIDE PANEL
6a. Starting with Right Side Panel, apply adhesive with
at least 3/16" bead around the outer edges of the
OSB board and in vertical lines with 6" spacings as
illustrated. NOTE: Each Panel will use approximately
1 tube of adhesive; if any remains after completing
the application pattern, apply remaining amounts on
OSB in dollops until tube is empty.
6b. Install the Right Side Panel back into the previously
marked position from step 5, check for plumb
and screw panel back in place.
6c. Press on the outside surface of the panel in the
area where the OSB board and adhesive is applied
to ensure good contact of the adhesive to the
inside of the Right Side Panel.
MARK
WALL
LOCATIONS
VERTICLE LINES
6" SPACING WITH AT
LEAST 3/16" BEAD
Tabla de contenido
loading

Este manual también es adecuado para:

2947sw t38

Tabla de contenido