Installation Instructions - Techem MB2 Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25

INSTALLATION INSTRUCTIONS

Measuring capsule water
GB
meter radio / vario (MID)
geometry MB2
Sample image with hood segment
Counter mechanism with:
• MB2 geometry for Minol MB2 connectors
• CE marking • Serial number
• Metrological properties
• Metrological markings including the number of
the type-examination test certificate
• Cold water version (T30) / Hot water version (T90)
Scope of delivery:
• Operating instructions with conformity declara-
tion
• 1 water meter • Sealants • Bag with disassembly
ring and 2x Techem adhesive seal
• Radio module (optional)
Important information
Target group
• Qualified craftsmen
• Specialist personnel trained by Techem
Intended use
Water meters are used exclusively to measure
drinking water consumption. Depending on their
version, they are either suitable for cold water or
hot water.
Alteration of the water meters is not permitted.
!
If a sealed meter is damaged or removed by a
person not authorised by Techem, the calibra-
tion is no longer valid.
!
Transport is carried out using the original pack-
aging.
Safety and hazard information
Observe hygiene in the drinking water area:
Ö Only remove the meter from its packaging direct-
ly before installation.
Ö Contact and contamination with surfaces which
contact drinking water must be avoided at all
costs.
Ö Only use lubricant permitted for drinking water,
e.g. Techem tap grease (item no. 160958)!
Avoid damages:
Ö Check sealing surfaces and clean them as neces-
sary.
Avoid billing errors:
Ö Do not install water meters in
circulation conduits.
Ö Observe the direction of flow!
Storage
Ö Max. 50°C
Ö Dry and frost-protected
Radio module for water meter radio
Ö Battery replacement is neither required nor ap-
proved.
Assembly
Approved installation positions
Precision class R xxxH / xxxV
H
V
H = Horizontal, V = Vertical
Prerequisites:
• Meter with radio module: Distance from power
supply lines ≥ 300 mm.
• Shut-off devices for later meter swap.
• Switch off devices connected on the supply net-
work in order to avoid damages from overpres-
sure or overtemperature.
V
V
Tabla de contenido
loading

Tabla de contenido