Wilo EMU RZP 20-1 Serie Instrucciones De Instalación Y Funcionamiento página 38

en
5.4.2
Installation pressure wedge – dis-
charge pipe with steel ring flange
3
2
1
2
Fig. 6: Pressure wedge: Discharge pipe with
weld neck flange
5.4.3
Installing the additional claw
2
1
3
Fig. 7: Discharge pipe with claw
38
Installation
1
Discharge pipe
2
Flange (steel ring)
3
Pressure wedge
▪ Align the pressure wedge perpendicularly.
▪ Affix the pressure wedge directly at the flange.
1
Discharge pipe
2
Pressure wedge
3
Claw
NOTICE! Observe the consulting aid when installing the additional claw.
WILO SE 2018-07
loading