Las Flue Duct Installation Options - Westen Boyler digit 240/40 Fi Manual Del Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 182
16.1 HORIZONTAL FLUE INSTALLATION OPTIONS

16.2 LAS FLUE DUCT INSTALLATION OPTIONS

16.3 VERTICAL FLUE INSTALLATION OPTIONS
This type of installation can be carried out on either a flat or a pitched roof by fitting a flue terminal and a special weathering surround
with sleeve (both available on request).
L max = 4 m Ø 60/100 mm
L max = 10 m Ø 80/125 mm
INSTRUCTIONS FOR FITTERS
L max = 4 m Ø 60/100 mm
L max = 8 m Ø 80/125 mm
L max = 3 m Ø 60/100 mm
L max = 7 m Ø 80/125 mm
L max = 4 m Ø 60/100 mm
L max = 8 m Ø 80/125 mm
L max = 2 m Ø 60/100 mm
L max = 8 m Ø 80/125 mm
41
L max = 3 m Ø 60/100 mm
L max = 9 m Ø 80/125 mm
926.008.2 - EN
Tabla de contenido
loading

Este manual también es adecuado para:

Boyler digit 240/60 fiBoyler digit 280/60 fiBoyler digit

Tabla de contenido