BEFORE INSTALLATION
without obstruction.
• Water Pressure. The product is designed to operate with a minimum working pressure of 20psi
.
INSTALLATION PROCEDURES
Place new flange bolts (A)
into toilet flange
Align bowl attachment holes
onto the T-bolts and gently
set on to seal plate.
Install the waxring to the
underside of the seal plate
and press evenly.
seal plate
wax ring
flange
Place washer and nut on top
of seal plate. Tighten down
snug.
Line up the side mount holes with the
floor brackets and secure with fixing screws.
Place the decorative cap over the screws.
Place template on floor
around the closet flange.
8-1/2"
6-1/4"
2
Mount brackets to floor
using template
8-1/2"
6-1/4"
Route the flexible supply line behind the
toilet and connect stop valve to toilet fill
valve. Hand tighten supply line and check
for leaks.