Before Installation; Installation Procedures - Mirabelle GALATIA MIRGA241 Instrucciones De Instalación

Ocultar thumbs Ver también para GALATIA MIRGA241:
Tabla de contenido

BEFORE INSTALLATION

.

INSTALLATION PROCEDURES

Step 1: Put the toilet at the appropriate location, mark
Step 2: Drill holes on the ground at the marked locations
Step 3: Confirm that the installation area is clean,
especially around the toilet mounting location. If
Step 3: Confirm that the installation area is clean,
especially around the toilet mounting location. If
NOTE: THIS TOILET IS NOT COMPATIBLE WITH OFF-SET
CLOSET FLANGES
CAUTION:DO NOT OVERTIGHTEN BOLTS,OR BASE
edges.
2
Closet Flange
(optional)
Closet Flange
(optional)
Tabla de contenido
loading

Tabla de contenido