Preparatory Steps - ALPIDEX 16161 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
1. Unfolding the buoyancy tube
2. Operating the valve
Open the valve cover by turning it counterclockwise. Remove the cover only when
you inflate the board or release the air. In doing so, you prevent particles from en-
tering the valve and air escaping by accident. The middle valve pin opens and closes
the valve and you can change its position and lock it by simultaneously pressing
and turning it 90 degrees. The valve must be closed when inflating the board, which
means the valve pin must be in the up position. To deflate the board, the valve must
be open and the pin set in the lower position.

3. Preparatory steps

Attach the air pump tube to the vent -marked „INFLATE"- of the supplied double ac-
tion pump. Make sure that the red plug of the air pump is screwed into place before
you start inflating. The pump is then in double stroke mode, i.e. air flows into the
Unroll the buoyancy tube on a smooth
surface. Ensure that no sand or dirt can
get into the valve.
11
Tabla de contenido
loading

Este manual también es adecuado para:

16162

Tabla de contenido