Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLY

The pick-up and unloader nozzle-chutes are not
assembled on the machine in order to facilitate
shipment.
Installing the PICK-UP NOZZLE-CHUTES
Fasten the nozzle-chutes straps to the existing
hooks on the machine, as shown in the following
figures.
EN-6180
- Place the straps in the hooks
Pick-up nozzle-chute
- This nozzle-chute is assembled.
12
OTHER MODELS
Instruction manual
ASSEMBLY
Installing the UNLOADER NOZZLE-CHUTE
(High or Low Nozzle).
Assemble the narrow and wide clamps and
fastening screws in the sequence shown below.
SPRING
NARROW
CLAMP
WIDE
CLAMP
fig.08
fig.09
- Low nozzle.
fig.10
- High nozzle.
fig.11
fig.12
fig.13

Capítulos

Tabla de contenido
loading

Productos relacionados para Nogueira EN-9F3B

Tabla de contenido