Connection Of Piping - Outdoor - LG A2UW18GFAB Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

FLARING WORK AND CONNECTION OF PIPING
18
- Bundle the piping and drain hose together by
wrapping them with vinyl tape over the
range within which they fit into the rear pip-
ing housing section.
CAUTION
!
Installation Information (For right piping) For right piping, follow the instruction below.
Good case
Press on the upper side of clamp and unfold
the tubing to downward slowly.

Connection of piping - Outdoor

Align the center of the piping and sufficiently
tighten the flare nut by hand.
Connecting pipe order
1) ROOM A~E gas side pipe
2) ROOM A~E liquid side pipe
Finally, tighten the flare nut with torque wrench
until the wrench clicks.
- When tightening the flare nut with torque wrench
ensure the direction for tightening follows the arrow
on the wrench.
Outside diameter
mm
inch
Ø6.35
Ø9.52
Ø12.7
Ø15.88
Ø19.05
Torque
N . m
1/4
16±2
3/8
38±4
1/2
55±6
5/8
75±7
3/4
110±10
Wrap with vinyl tape
Pipe
Drain hose
Bad case
Following bending type from left to right could
cause problem of pipe damage.
Outdoor unit
Main liquid
side valve
Liquid
side piping
Vinyl tape(wide)
Ø12.7(1/2 inch) Connector
Main gas
side valve
Gas side piping
ROOM A
ROOM B
ROOM C
ROOM D
ROOM E
Tabla de contenido
loading

Este manual también es adecuado para:

A3uw24gfabA3uw36gfab

Tabla de contenido