Hach SP-510 Manual Básico Del Usuario página 11

Ocultar thumbs Ver también para SP-510:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
Figure 5 Sampling methods
1 Air
4.2.4 Install the pump valve pressure plate
The pressure plate and screws are supplied with the installation kit. Remove the tape from the pump
tubes before installation.
Make sure to turn the screws in small increments and move from one screw to the other so that the
plate is pulled down equally. Do not overtighten. To install the pressure plate, refer to
Figure 6 Install the pressure plate
4.2.5 Install the sample conditioning kit
The sample conditioning kit is supplied with the instrument. The kit removes large particles from the
sample stream with a 40-mesh strainer. The ball valve on the raw sample inlet controls the flow to
the filter. The ball valve on the instrument supply line controls the flow rate of filtered sample to the
instrument. For complete sample conditioning installation instructions, refer to the installation kit
documentation. Refer to
Figure
7.
2 Sample flow
Figure
6.
English 11
Tabla de contenido
loading

Tabla de contenido