PRE-INSTALLATION CHECKLIST
BEF OR E Y O U B E G I N
A structural engineer has approved the mounting structure.
The location of the fan will alow for a minumum of 2 feet of blade clearance
from any obstruction and at least 10 feet of clearance above the floor.
The fan location will not be subjected to high winds.
If installing multiple fans, reference the fan placement chart for optimal spacing.
The control panel, motor and blade assemblies are all marked with the fan
diameter. Ensure the markings all match when assembling the fan.
The control panel voltage markings
should match your building
(100-120VAC)
supply power.
The fan power should be run to 5 feet outside the swept area of the fan. Please
refer to the chart on page 19 for the appropriate receptacle and breaker size.
7