Kohler K-7779 Guia De Instalacion página 5

Grifería de fregadero de cocina
Ocultar thumbs Ver también para K-7779:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Apply plumbers
putty to the
escutcheon.
Valve Body
Washer
Nut
3. Valve Body Installation
Remove the nut and washer from the valve bodies.
Apply a bead of plumbers putty or other sealant to the underside
of the escutcheon according to the manufacturer's instructions.
Insert each valve body through the holes in the fixture or deck.
Be sure that the valve marked COLD is set on the right-hand
hole.
Align the valve bodies so that the copper tubing faces the
outside.
Slide the washer up to the underside of the deck or fixture for
each valve body.
Secure the valve bodies with the nut.
Remove any excess putty or sealant.
Install the handles according to the directions packed with the
handles.
Kohler Co.
Nut
Copper
Supply Tube
5
Washer
117127-2-AB
Tabla de contenido
loading

Tabla de contenido