Installation (continued)
3
Threading the supply lines
NOTE: If you want to solder the supply lines, proceed
to step 4.
□
Attach the supply lines (not included) to the
faucet (A): cold to the right side, hot to the left.
Slide the union nuts (F) over the supply lines.
□
Wrap thread sealant tape (not included) around
all the male threads in a counter-clockwise
direction, as shown.
□
Thread the connectors (E) to each supply line.
□
Attach the union nuts (F) to the faucet (A).
Do not overtighten.
F
4
Soldering the supply lines
□
Attach the supply lines (not included) to the
faucet (A): cold to the right side, hot to the left.
Slide the union nuts (F) over the supply lines.
□
Remove the O-ring (D) from the connectors (E),
solder, and replace when cool.
□
Attach the union nuts (F) to the faucet (A). Do
not overtighten.
E
A
5
Please contact 1-855-HD-GLACIER for further assistance.
E
D
A
HOMEDEPOT.COM/GLACIERBAY
F