Vertiv Edge Lithium Ion Serie Manual De Instrucciones página 2

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
Vertiv™ Edge UPS
Quick Installation Guide
Installations
1. Inspecting the UPS
Inspect the contents of the box. If
anything is missing or damaged
contact us. The following items are
included:
All models:
• Vertiv™ Edge UPS
• Accessory bag including
y Quick install guide
y Safety and regulatory
statements
y USB type A to B cable
• Rail kit box
y Left and right rail set
y 12 x Rail kit screws (M5 x
14mm)
• 4 x Tower feet
• 2 x UPS rack ears with 8 x rack
ear screws (M4 x 8mm)
• 2 x IEC C13 to C14 output
cables
EDGELI-1500IRT2U only
• Input power cable IEC Schuko
to IEC C13
• Input power cable BS1362 to
IEC C13
• Input power cable AUS to IEC
C13
EDGELI-2200IRT2U and EDGELI-
3000IRT2U only
• Input power cable IEC Schuko
to IEC C19
• Input power cable BS1362 to
IEC C19
• Input power cable AUS to IEC
C19
2. Choosing a location
Install the Vertiv™ Edge UPS in a
temperature-controlled
environment that is free of
corrosive and conductive
contaminants. Avoid locations near
heat or water sources and exposed
to direct sunlight. For proper air
flow, leave four inches of clearance
on the front and back of the UPS.
2
SL-70757_REVA_03-21
Rack Installation
1
3
Tower Installation
3. Installing the UPS
The Vertiv™ Edge UPS may be
installed in either a rack or tower
configuration.
For rack installation:
1. Attach a rack ear with four rack
ear screws to the front right and
left sides of the UPS.
2. Install the rear member of the
rail onto the rack with one rail
kit screw on the top and one on
the bottom. Loosely tighten the
screws (finger tight). Slide the
front member of the rail to the
front of the rack and secure the
two bottom holes to the rack
with two rail kit screws. Tighten
all screws. Repeat for the
second rail.
2
4
70 mm
70 mm
3. Place the UPS with assembled
rack ears onto the rail supports.
The batteries may be
temporarily removed for easier
installation (see Replacing the
Battery section)
4. Attach two rail kit screws to
each UPS rack ear and rail to
secure the UPS to the rack.
For tower installation:
1. Connect two tower feet
together. Repeat to assemble
two tower stands.
2. Place the UPS in the tower
stands 70 mm from each edge
of the UPS.
Tabla de contenido
loading

Este manual también es adecuado para:

Edgeli-1500irt2uEdgeli-2200irt2uEdgeli-3000irt2u

Tabla de contenido