Kohler K-7374 Guia De Instalacion página 3

Cabeza de ducha
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

72" (182.9 cm)
to Floor, Typical
1. Prepare the Valve
IMPORTANT! Secure the piping to the framing.
Install or relocate the water supplies as necessary.
A typical bath and shower installation is plumbed using 1/2"
copper tubing and adapters.
Use thread sealant on all threaded connections.
Temporarily install 1/2" nipples to the bath and shower elbows,
extending at least 2" (5.1 cm) beyond the finished wall.
Turn on the water supply and check for leaks.
Complete the finished wall.
Kohler Co.
Shower Ell
Temporary
Nipple
1/2" Piping
1/2" Male
Adapter
Spout Outlet
3
113280-2-AB
Tabla de contenido
loading

Este manual también es adecuado para:

K-16133K-16134

Tabla de contenido