Pentair Raychem JBM-100-A Instrucciones De Instalación página 2

Ocultar thumbs Ver también para Raychem JBM-100-A:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Heating Cable Types
• Determine heating cable type
and continue as shown.
Clear jacket
Insulated bus wire
VPL
Go to Step 1A
1A
• Cut each heating cable 12 in (30 cm) from the center of
the first indentation, cut at a 45° angle.
Cut at 45
12 in (30 cm) minimum
angle
• After heating cable has been cut, align indentations.
Allow approximately 24 in (60 cm) of heating cable for
installation.
24 in
12 in
(60 cm)
(30 cm)
Centerline of
connection
THERMAL MANAGEMENT SOLUTIONS
Outer
jacket
Braid
Inner jacket
Heating element
Bus wire connection
XTV-CT, KTV-CT
Go to Step 1B
VPL
Indentation
(bus wire
connection)
Align heating
cable indentations
Go to Step 2
EN-RaychemJBM100A100A6-IM-H56344      03/13
Braid
Inner jacket
Conductive fiber
Spacer
Bus wire
1B
XTV, KTV
Centerline of
connection
2
Complete steps 2 through 6 for each heating cable before
going on to the next length of heating cable.
Box nut
Outer jacket
Inner jacket
Conductive core
Bus wire
BTV-CR, BTV-CT, QTVR-CT
Go to Step 1B
BTV, QTVR
• Allow approximately
24 in
24 in (60 cm) of heating
(60 cm)
cable for installation.
• Cut off heating cable
end at a 45° angle for
easier insertion.
• Do not remove box nut from
stand. Push heating cable
through stand and nut as
shown. Use cable lubricant if
18 in
needed.
(45 cm)
• Square off cable end with 90°
angle cut.
• Do not attach stand
to pipe until step 8.
Outer
jacket
Braid
Go to Step 2
2 / 10
Tabla de contenido
loading

Este manual también es adecuado para:

Raychem jbm-100-a6

Tabla de contenido