Assembly instructions Art. T07-SeaSide
The product must be installed exactly as supplied by Teuco, otherwise warranty will be invalidated.
The directions for installation must be observed to the letter, as must those concerning recommended materials and the accessories
supplied with the product.
Electrical connections must be carried out in compliance with safety regulations governing bathroom installations as described in the
enclosed INSTALLATION REGULATIONS manual.
This manual constitutes an integral part of the product and must be kept for future reference.
HANDLING THE BATHTUB:
When removing the bathtub from its packing and throughout handling operations, lift by the rim or the frame.
CHECKS:
Having removed the bathtub from the packing, inspect for possible defects.
DAMAGE CAUSED BY IMPACT OR ABRASION IS NO LONGER COVERED BY WARRANTY ONCE THE TUB HAS BEEN INSTALLED.
Make certain that plumbing and electrical connections are made as indicated in the PREINSTALLATION instructions (STEP 1).
The tub must be installed with floor and walls already finished.
All Teuco products are tested, inspected and packed before leaving the factory. When unpacked, the tub may contain traces of water from
factory testing; before proceeding with final installation and completing masonry works, if any, run a further test as described under
"OPERATION TEST" to make doubly certain that the product functions exactly as it should.
If faults or substandard operation of the system are discovered, contact a Teuco technician or approved service centre.
The company will acknowledge no liability for damage to appliances that have been tampered with.
Data and specifications indicated in the manual are not binding on the company: Teuco Guzzini SpA reserves the right to make such changes
as are deemed appropriate without notice or obligation to update.
1
- PREINSTALLATION art T07-SeaSide
- Hot water tap connection
- Cold water tap connection
- IPX5 box with PG13.5 and PG9 cable clamps
- E
LECTRICAL CONNECTION
- A
LARM SYSTEM CONNECTION
2
- PREPARING THE BUILT-IN ENCLOSURE
When preparing the enclosure and panel, keep to the
measurements indicated in the drawing.
A full-length removable panel must be provided along the side of
the tub (as illustrated), allowing inspection and ventilation of the
system; the panel must be secured semi-permanently (with
screws, for example) in such a way that a tool is needed to
remove it, as prescribed by safety standards.
FITTING THE ALUMINIUM SECTIONS
3
- Join the aluminium sections together with the plates and
threaded studs supplied by Teuco.
Be sure to observe the measurements indicated when
positioning the sections.
4
- Apply the sections to the edge of the enclosure with NEUTRAL
(Non Acetic) silicone sealant.
5
- Secure the sections to the edge with screws and masonry plugs
ON TWO ADJOINING SIDES ONLY.
6
PLUMBING CONNECTIONS
-
Rest the tub on the enclosure wall so that plumbing and
electrical connections can be made.
Connect the taps to the hot water supply (
water supply (
).
Connect the waste to the drain using the trap provided.
IMPORTANT
1
2 "
/
1
2 "
/
) and to the cold
- ELECTRICAL CONNECTIONS
7
Before making any electrical connections, check that the rated
voltage and current of the appliance (see data plate) are
matched to the mains power supply.
- IPX5 box with PG13.5 and PG9 cable clamps
- E
LECTRICAL CONNECTION
- A
LARM SYSTEM CONNECTION
Connect the alarm
an alarm system.
EQUIPOTENTIAL EARTH CONNECTION
Use terminal S for the connection of any external wires that
need to be equipotentially bonded.
- LEVELLING THE TUB
8
Position the tub correctly in the enclosure, being careful not to
disturb the waste connection.
Level up the tub, first by adjusting the outermost feet, then bringing
the middle feet into contact with the floor.
Make the adjustment so as to leave a clearance of 38 mm
minimum between the rim of the tub and the surround wall.
TESTING THE BATHTUB
1 Clean any dirt from the tub
2) Fill the tub up to the level of the overflow
3) Start up the system (see user manual), then proceed to check
that there are no leaks, and no error messages displayed on the
control panel
4) Having run the test, complete the installation.
- FITTING THE OPALINE TRIMS
9
Clip the opaline trims onto the aluminium sections fitted
previously, under the rim of the bathtub.
GB
- only if the bathroom is equipped with
11