Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALL THE DUCTWORK
IPP9IQ Series
WARNING: To reduce the risk of fi re, use
only metal ductwork.
1. Decide where the ductwork will run between
the hood and the outside.
2. A straight, short duct run will allow the hood
to perform most effi ciently.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use
as few of them as possible.
4. Install a roof or wall cap. Connect 10"
round metal ductwork to cap and work back
towards hood location. Use duct tape to seal
the joints between ductwork sections.

IN-LINE BLOWER

- 8 -
ROOF CAP
10" ROUND
DUCT
10" ROUND
ELBOW
DECORATIVE
HOOD
FLUE
24" TO 36" ABOVE
COOKING SURFACE
FIG. 5
Tabla de contenido
loading

Este manual también es adecuado para:

Ipp9e42sbIpp9iqt42sb

Tabla de contenido