Termination resistor: built in, selectable by a switch. 120 ohms resistor is needed
at both end of the line and must be switched or not depending on the location in
the Modbus network topology.
-
Transient voltage suppressors
-
Screwed terminals on the RS485 side
-
TX – RX Led indication for easy debugging and troubleshooting
-
Slew-Rate Limited for Error-Free Data Transmission (minimizing EMI and
reducing reflections caused by improperly terminated cables)
-
Drivers are short-circuit current limited
-
The receiver input has a fail-safe feature in case of broken connection
Compatible Devices: Any Modbus device capable of Modbus communication as a
-
master.
-
Speed reply time: better than 5 ms @ 57600 bauds
-
Max data packet: Any complete table provided in the Modbus data table

4.5 Commissioning process

To install the RS485 Modbus adapter, follow the hereafter commissioning process.
-
Disconnect power supply from the controller
-
Wait the required time to ensure all capacitors are discharged
-
Connect the signal ground (if present) to GND
Connect the twisted pair to the A and B connections
-
Insert the RS485 Modbus adapter in the controller
Fix it with the appropriate screw
-
-
Ensure that all connections are tight.