Operation - Glacier bay HD67109W-8004 Guía De Uso Y Mantenimiento

Grifo para lavamanos, de una sola llave
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Checking the operation of the
pop-up
Operate the lift rod (Q) up and down to verify
that the stopper (H) opens and closes correctly.

Operation

1
Flushing and checking for leaks
Ensure the faucet (A) handle is in the off
position and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
Turn on the hot and cold water handle to allow
the water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
Turn off the water.
Q
H
10
Making the water supply
connections
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
Use wrenches to tighten the connections. Do not
overtighten.
1
3
8
2
A
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hd67109w-8096h30468556530468587410031419601003141962

Tabla de contenido