Scheduled Routine Maintenance; Care And Cleaning Of The Vacuum Packaging Machine - Berkel BV 400/25 Manual De Uso Y Mantenimento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

7.2 SCHEdulEd rouTINE MaINTENaNCE

frEquENCy
Before each start-up.
End of work shift.
weekly.
Every 25,000 operating cycles
(about 200 hours of service).
Every oil change.
Every 6 months.
Before an inactivity period of
two months or longer.

7.3 CarE aNd ClEaNINg of THE vaCuuM PaCkagINg MaCHINE

ElECTrIC HaZard!
danger of electric shock !
Remove the machine plug from the power socket. Do not use water or steam jets.
daNgEr!
Danger of burns: if alcohol-based or inflammable disinfectant products are used, ventilate
the area. Do not use naked flames near the machine! Do not smoke!
aTTeNTION! Danger of injury! Use personal protective equipment. Do not use caustic pro-
ducts, acids or aggressive products such as muriatic acid. read the instructions on the
detergent product or disinfectant pack carefully.
Instruction manual for vacuum chamber packaging machines Mod. BV 400/25 – BV 400/25H – BV 600/60
Instruction manual for vacuum chamber packaging machines Mod. BV 400/25 - BV 600/60
Rev. 01 - 04/2019 - Cod. 1500656 - Instruction manual for vacuum chamber packaging machines Mod. C46-C46H-C62
MaCHINE ParT
Pump.
Power cable.
Plexiglass Lid.
Silicone counterpart bar and Ple-
xiglass lid gasket.
Machine and Vacuum chamber.
Pump.
Sealing bar
Pump.
Pump.
Pump.
Pump.
Pump.
a
INTErvENTIoN
Check the level and colour of the oil; top-up or re-
place, if the colour is too dark or whitish.
Perform a pump heating cycle of at least 5 minutes,
or an oil dehumidification cycle.
Verify its integrity; replace if defective (contact a
specialised after-sales centre).
Verify its integrity; if there are any cracks or streaks,
contact the after-sales centre to replace the lid.
Check that they are inserted well into the respective
seats; replace if defective or worn.
Clean impurities, oil and grease.
Perform an oil dehumidification cycle.
Clean the upper part with a damp cloth.
Clean the two contact pins.
Run the pump for about 5 minutes (using the PuMP
function) to allow removal of water from the pump oil.
Replace the pump oil (contact a specialised after-
sales centre).
Replace the oil filter
(contact a specialised after-
a
sales centre).
Replace the pump oil (contact a specialised after-
sales centre).
Replace the pump oil (contact a specialised after-
sales centre).
29
Tabla de contenido
loading

Este manual también es adecuado para:

Bv 400/25hBv 600/60

Tabla de contenido