Klarstein SOFIA Manual Del Usuario página 31

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Wall Drilling and Bracket Fixing
As a first step, proceed with the following drawings:
• A vertical line up to the ceiling or up to the upper limit, at the center of the area in
which the hood is to be fitted.
(A) A horizontal line A at 1270–1560 mm above the cooker top.
(B) A horizontal line B at a minimum 887 mm (840 mm optional) above the cooker top.
(C) A horizontal line C at a minimum 717 mm above the cooker top.
Mark Points
Note: The specified values are [mm].
(1) Mark a point (1) on the horizontal line A, 40 mm to the right of the vertical
reference line. Repeat this step on the left side of the reference line and make sure
that the two points are at the same height.
(2) Mark a point (2) on the horizontal line B, 80 mm (135 mm oprtional) to the right
of the vertical reference line. Repeat this operation on the other side and on the
vertical reference line, checking that the three marks are leveled.
(3) Mark a point (3) on the horizontal line C, 1 12.5 mm to the right of the vertical
reference line. Repeat this operation on the other side, checking that the two marks
are on the same horizontal line.
Fix the brackets (optional)
• Drill at the marked points (1) (2) (3), using a 10 mm drill bit.
• Insert the Wall Plugs into the holes (1) (2) (3).
• Fix the hood fixing bracket with 3 screws (5 x 50) supplied with the hood.
• Fix a Chimney fixing bracket with 2 screws (5 x 50) supplied with the hood.
EN
31
Tabla de contenido
loading

Este manual también es adecuado para:

10034258100342591003426010034261

Tabla de contenido