Kohler K-4917 Guia De Instalacion página 4

Ocultar thumbs Ver también para K-4917:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Wall
2" Drywall
Screws
Wall Hangers
Lag Bolts
2. Install the Urinal
CAUTION: Risk of personal injury. Handle with care.
Vitreous china can break or chip if the product is handled
carelessly.
Reference the installation template to properly position each wall
hanger at its proper vertical dimension above the outlet hole. To
allow for vertical adjustment, place the initial screws through the
center of the slots on the hangers.
Apply thread sealant tape to the pipe threads on the drain and
install the collar to the drain.
With the beveled surface of the gasket facing away from the
collar, place the gasket onto the collar.
Carefully position the urinal on the wall hangers.
Verify the urinal is properly positioned, then remove the urinal
from the wall.
NOTE: If adjustment is necessary, make vertical adjustments along
the slots on each wall hanger until the urinal can be tightened to the
collar.
Install the permanent screws or lag bolts into the holes on the
wall hangers, as shown on the installation template.
Secure the urinal to the collar using the washers and bolts
provided.
1048744-2-D
Strainer
Installed Wall
Hangers
Apply sealant
tape.
Washer
Bolt
Gasket
4
Drain
Collar
Kohler Co.
Tabla de contenido
loading

Tabla de contenido