PowR-Quip Contractor Serie Manual De Instrucciones página 7

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

GROUNDING
Be sure that the welder/generator is grounded to prevent
1
accidental electric shock. It has an earth terminal
provided for this purpose.
2
The ground wire size must be 8 AWG and you can
connect to the terminal using flat tip screwdriver to lift
the terminal screws that tighten the cable.
3
The other end of the ground wire must be fastened
securely to an approved grounding source.
Following this is described ground sources approved by
the national electric code.
Other ground sources may be acceptable.
Refer to the national electric code and local regulations
for more information on sources of ground. If you are
not sure about the regulations or procedures, obtain
assistance from a qualified electrician (licensed or
certified)
a. an underground water pipe of at least 10 feet (3 m)
length.
b. a non-corrosive underground pipe at least 8 feet (2.4
meters) long and ¾ inches in diameter.
c. underground bar of copper of at least 8 feet (2.4 m)
length and 5/8 inches in diameter.
d. a Nonferrous rod of at least 8 feet (2.4 m) in length and
½ inch in diameter and approved for grounding purposes.
Any bar or pipe used to make a ground connection must
be carried to eight feet (2.4 m) deep or buried in the
deepest possible trench.
START PROCEDURE
1
Remove all electrical loads from the welder / generator.
2
Turn fuel shut-off valve in counterclockwise direction to
allow the fuel to flow.
3
Turn the engine switch to the (ON) position.
Adjust lever choke in the following way:
a. for a cold engine, move the choke lever as much as
possible to the left, flooded completely in ON (open)
position.
b. for a warm/hot engine move the choke lever to an
intermediate position between the positions of drowned
and run.
4
Pull the starter rope with a firm and smooth motion.
Note: Some models may be equipped with an electric
starter. For models equipped with an electric starter,
turn the key.
5
After each start-up, allow the engine to run for 2-3 minutes
without load.
6
As the engine heats up and stabilizes, setting drowning
right lever, until it is positioned on the RUN label.
THE ENGINE SPEED IS DEFAULT TO PROVIDE
ADEQUATE VOLTAGE OUTPUT. NEVER ATTEMPT
TO MODIFY OR ADJUST THE MOTOR SPEED OR
OUTPUT VOLTAGE.
SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE
All manuals and user guides at all-guides.com
SETTLEMENT OF THE ENGINE
After initial start-up, the engine must pass a settlement
run according to the manufacturer's instructions. Refer to
the engine manual for instructions on proper settlement
run procedure.
TURN OFF
Turn off and remove all devices of electric charge from
1
the welder/generator.
2
Allow the engine to run for 2-3 minutes without electrical
loads.
3
Turn the engine switch to the (OFF) position.
4
Check that the welder/generator has completely stopped.
5
Close the fuel supply valve.
6
Allow the unit to cool before installing any cover
LOW OIL LEVEL SHUT DOWN
These models are of long run, an automatic low oil level
shutdown switch is provided to protect the engine and
the welder/generator.
When the engine oil level drops below the level needed for
a proper functioning of the engine, low oil level shutdown
switch makes the engine turns off. If the oil level is low
when trying to start the engine of the equipment, the
low oil level shutdown switch prevents the engine from
starting. If the engine does not start, check the oil level.
Note: It is important to keep the unit on an even surface.
The oil level shutdown switch can prevent the engine from
starting even if oil level is sufficient, when the welder/
generator is placed on an inclined surface.
OPERATION AS A GENERATOR
THE FRONT PANEL SWITCH MUST BE PLACED IN
GENERATOR.
PREPARATION AND INSTALLATION OF
THE GENERATOR
Place generator outdoors where it will be used. This
1
should be on a flat surface, and away from flammable
materials. Do not allow the generator to get wet.
2
Fill the tank of fuel (outdoors) up to 21 litres of gasoline,
do not fill the tank up to the top.
Add 1.1 liters of oil to the engine by removing the bayonet
3
that is located on the side of the engine. Use SAE 10W-30
oil. Use a funnel to avoid spillage of oil. Check the oil level
with the bayonet; this should be marked "full". Carefully
replace the oil plug, so avoiding damaging of the threads.
Before connecting the equipment to the generator,
4
check they are in off position. Go to the section HOW TO
DETERMINE POWER in this manual. Do not overload
the generator. Calculate the total power of the equipment.
The maximum power of the generator is indicated in the
specification sheet.
7
Tabla de contenido
loading

Este manual también es adecuado para:

W240mg1400kp

Tabla de contenido