Pull the retractable motor cord (with a fast steady pull), if
5
manual start, or turn the ignition switch key, if it is electric
start (turn the ignition key to the "START" position, and
then release the key after the engine starts).
After starting back choke lever to its original position (to
6
the left)
CAUTION
Allow the welder/generator to run with no load for five
minutes after each initial start-up to allow the engine
and the alternator to stabilize.
DANGER
• It must be provided adequate ventilation for
toxic gases and air flow for engine cooling (the
engine is cooled by air that is injected by its
own fan)
• Do not start or start the welder/generator in
an enclosed area, even if doors or windows are open.
• The motor has carbon monoxide, a poisonous, odorless
and invisible gas.
• Vacuum carbon monoxide can cause nausea, fainting
or even death.
HOW TO APPLY A LOAD
This unit has been pretested and adjusted to handle its
full capacity. To start the generator, disconnect all loads.
Apply load only after the welder/generator is running.
Voltage is regulated via the engine speed adjusted at
the factory for correct output. Move the motor speed will
make you lose the warranty.
GENERATOR'S TURN OFF
Remove all electrical loads.
1
2
Let the engine run for a few minutes without load.
3
Move the motor key to the "OFF" position. (Turn the key
to "OFF" on the electric start models)
Do not leave the welder/generator until operation is
4
stopped completely.
Close the fuel valve if the motor must be placed in storage
5
or transport.
If you are going to place a cover over the equipment for
6
protection, wait until the unit has became cool.
INITIAL START UP
CAUTION
Do not apply a strong electrical charge
during the initial period of operation (the
first 2 or 3 hours of operation).
A controlled initial startup procedure helps to ensure
correct operation of the engine and generator. Follow
the procedure described in the engine manual engine.
SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE
All manuals and user guides at all-guides.com
OPERATION WELDER
THE SWITCH ON THE FRONT PANEL MUST BE
PLACED IN ANY WELDING POSITION AS REQUIRED.
Welding cables and clamps are not included with the
units. Use welding cable of the size specified in table 5.
CLIP FOR GROUNDING (FIG.1)
R e m o v e ½ " ( 1 . 3 c m ) o f
1
insulation from the end of one
wire welding.
2
Loosen the hex nuts on work
clamp.
3
Insert the end of the welding
cable through clamp handle and slide the wire bare under
the clamp block.
4
Tighten hex nuts securing the cable in place.
ELECTRODE HOLDER (FIG.2)
Remove 1" (2.5 cm) of
1
insulation from the end of
the other wire welding.
2
Remove handle insulated
electrode holder and slide
it over the welding cable.
3
Loosen the two set screws
which are located in the
lower part of the electrode holder making sure that the
blade is between cable and fixing screws.
Slide the wire without insulation within the back of the
4
electrode holder making sure that the blade is between
cable and fixing screws.
5
Tighten the two fastening screws securing the cable in
place.
6
Slide the handle into place in the electrode holder.
PLUGGING DINSE
Remove ½" (1.27 cm)
1
of insulation from the
end of one wire welding.
2
Insert this end of the
welding cable through
the transition from the
"dinse" plug and slide
the bare into the sleeve
of the cable wire.
Insert assembly sleeve cable soldering wire into the back
3
of the plug "dinse".
4
Tighten the fastening screws securing the cable in place.
5
Slide the attachment of transition over the hex portion
of the plug "dinse".
6
Repeat the same steps for the other side.
11