Kohler K-T314 Instrucciones Para La Instalación página 6

Ocultar thumbs Ver también para K-T314:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Supply Tube Connection: Measure the distance from
the bottom of the spout supply tube to the top of the tee.
Add 1" (2.5cm) to this measurement, and cut a piece of
1/2" nominal (5/8" O.D.) copper tubing to fit into the supply
tube and tee port.
Back off the threaded collars as far as possible without
removing them. Pivot the valve bodies enough to remove
the tee and two pieces of tubing. If the valve body holes
are smaller than recommended, it may be necessary to
remove the entire valve body assembly.
Install the tubing into the tee. Mate the copper tube from
the tee with the spout supply tube. Pivot the valve bodies
onto the two pieces of copper tubing.
DO NOT solder at this time.
Reset Valve Body Height: Adjust the threaded collars
until the dimension from the top of the valve threads to the
top of the rough deck surface equals the clearance
requirement you calculated in Fig. #9.
Tighten the mounting nuts on each valve body underneath
the deck.
Solder the copper tubes to the valve bodies, tee, and
spout supply tube.
Ensure that the cold supply is on the right side.
Solder the hot and cold water supply tubes to the valve
body inlets.
A
1012557-2-
Threaded
Collar
Rough
Deck
Mounting
Nut
Top of Valve Threads
Pre-determined
Clearance
Requirement
Copper
Rough
Tube
Deck
Valve
Body
Mounting
Nut
Solder
Hot
Supply
6
Spout
Supply
Tube
Copper
Tube
Tee
Fig. #10
Tile
Thickness
Threaded
Collar
À À À À
À À À À
É É É É
Rough
Deck
É É É É
Fig. #11
Spout
Supply
Tube
Solder
Solder
Fig. #12
Kohler Co., Kohler, WI U.S.A.
Cold
Supply
Tabla de contenido
loading

Este manual también es adecuado para:

K-t314mK-t333K-t333m

Tabla de contenido