Wiring Diagrams And General Information - Zoeller X6161 Manual De Propietario

Bombas para ubicaciones peligrosas
Ocultar thumbs Ver también para X6161:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

All installation of controls, protection devices and wiring should be done by a qualified licensed electrician. All electrical and safety codes should be followed
including the most recent National Electrical Code (NEC) and the Occupational Safety and Health Act (OSHA).
SINGLE PHASE
HAZARDOUS LOCATION PUMP DESCRIPTION
1. Pumps are constructed of class 30 cast iron with powder coated epoxy
protection for long life when pumping sewage in submersible applications.
2. Pump motors are available in single and three phase design.
3. The hazardous location pump is a dual seal design and has seal leak probes.
Single phase units have an internal thermal overload. Three phase pumps
have a thermal sensor. A moisture sensor seal fail circuit is incorporated into
the control panel required for nonautomatic pumps.
4. Three phase pumps require overload protection in the control panel.
5.
These pumps are to be repaired by a firm approved by Zoeller
Company and in accordance to Policy # ZM1462-3c. Otherwise, they are to
be returned to the factory for repair.
Note: cCSAus listed pumps are certified to CSA stardard C22.2 No. 145
and tested to FM stardards 3600, 3615 and 3616 by CSA.
EXPLOSION PROOF WIRING DIAGRAMS
X6160, X6180, X6280, X6290, X6400 SERIES
Not for use in acidic atmospheres.
012941
GENERAL INFORMATION
© Copyright 2021 Zoeller
THREE PHASE
FIELD ASSEMBLED INSTALLATION
1. Contractor shall furnish all labor, material, equipment and incidentals
required for installation of hazardous location pump.
2. Installation and piping instructions are included with the rail system and
basin instructions. If pump is being retrofitted to an existing rail system,
accessory parts may be required. Consult the factory and advise make
and model of rail system being used.
3. All electrical connections including pump to control box and power supply
to control panels must comply with the "National Electrical Code" and
applicable local codes. Installation of electrical panels and connections
should be made by a qualified licensed electrician.
4. When installing a pump with a check valve, or a rail system with a check
valve, you must give the pump case time to fill to help prevent air lock
when lowering the unit into the liquid. The X6404X/6405 pump case has
an air vent located behind the discharge. This air vent is across the pump
housing mounting surface and must be cleaned before each reinstall. An
air vent hole (3/16" [4 mm]) must be drilled in discharge pipe below the
check valve to help prevent air lock. This drilled hole must be cleaned
before each reinstall. After the pump is installed, run the unit submerged
to assure the pump case is filled (water should come out of 3/16"
[4 mm] diameter hole).
Co. All rights reserved.
®
5
012943
Tabla de contenido
loading

Tabla de contenido