Section 17
Install 29' Wire Harness
Step 1
A
Step 1
Route the 29' Wire Harness using Route A .
Route A : Wire goes from the CHMSL,
behind the headliner, down the driver side
pillar, through the grommet hole in the rear
of the cab, into the vehicle bed, and along
the top of the bed, underneath the bed
rail cap.
NOTE:
Be sure the wire harness is secured
between the vehicle cab and bed. Cut two
2" pieces of the Foam Tape #595.31 and
use the tape to fasten the wire to the back
side of the vehicle bed, as shown in the
Detail.
Hardware
29' Wire
Harness
Foam Tape
Qty. 1
Part #595.31
2' Pieces
P22 - 77332 Rev. C 1219
Detail
A
Tools
Pliers
Detail
Installation Instructions - Supertop for Trucks
Step 2
Foam
Tape
Cut grommet
to allow loom
to pass through
WARNING
Wire Harness must
be routed clear of
all airbags.
Page 22
Step 2
Bring the free end of the loom from
the CHMSL across the roof behind
the headliner, down the driver side
pillar, and through the grommet hole
to the outside of the vehicle.
Take the previously removed
grommet, cut to allow the loom to
pass through the grommet, and
re-install the grommet in the hole,
around the loom.
NOTE:
Cut sound-deadening foam
as required.
© 2019 Bestop, Inc.