The connector [3-2] between the two me-
chanically operated slides [3-1] must be de-
tached.
EW >> EW/DW (VE2-EAA: 495892)
Modification: additional connection socket
for pneumatic tools.
An additional maintenance unit (pressure
regulator, condensate trap, lubricator) and a
compressed air module including pneumatic
hoses and connection to electronics via wir-
ing harnesses must be mounted. Note: only
trained and qualified electricians are autho-
rised to perform this work!
EW/DW TURBO/M >> EW/DW TURBO/
A (UBS EAA-MA: 495891)
Modification: pneumatically operated slides
replace manual slides.
The complete floor group (the mechanically
operated slides, vacuum connections and
compressed air connections) must be re-
placed. In addition, solenoid valves must be
fitted, the compressed air module adapted
and wiring harnesses for the electronics re-
placed. Note: only trained and qualified
electricians are authorised to perform this
work!
7
Assembly
WARNING
Risk of injury, damage to property
Before installing the unit, have a structural
engineer check the static conditions of the
planned attachment point!
Germany only: Festool offers you the op-
portunity to have the energy box or the
boom arm assembled by an authorised fitter.
The energy box or boom arm is assembled
completely and handed over ready to use.
We recommend using this service for quicker,
more reliable assembly.
There are three different mounting op-
tions for the EAA:
1.Attachment to a boom arm (ASA CT/SRM
2500, ASA CT/SRM 5000, ASA TURBO
5000, ASA CT/SRM 6000, ASA TURBO
6000): the required assembly set is includ-
ed with the boom arm.
2.Wall mounting: an additional assembly set
is required (EAA-W: 495889).
3.Ceiling installation via bracket: an assem-
bly set is required (EAA-D: 495899).
7.1
Attachment to Festool boom arm
The energy box may only be used in com-
bination with a Festool boom arm ASA
with joint (see Fig. [4]). If you have an
older boom arm with a previous model of
joint, use conversion kit 489704.
The assembly set is included in the ASA
scope of delivery and contains:
– Aluminium pipe for suspending the EAA
– Ready assembled mains cable and control
line with international standard interface
– Compressed air line
– 2 x protective sleeves
– 3 x cable clips
– 2 x hose hooks
Procedure
Mount the boom arm on a wall or pillar.
Read the operating manual supplied with
the boom arm.
The aluminium pipe is 1.6 m in length on
delivery. The pipe can be shortened at the
open end if necessary. We recommend
adapting the length of the pipe so that the
tool holder [1-1] on the EAA is positioned
at forehead height. Always deburr the
aluminium
pipe
length!
Remove the rear panel of the EAA.
Grease the bottom section of the alumin-
ium pipe and slide into the Y-piece on the
EAA [5-8] up to the stop.
Tighten the two screws [5-9] on the grip-
per clamp to a tightening torque of 6 Nm.
The EAA is now seated securely on the
aluminium pipe.
Skip to chapter 8 "Connections in the EAA".
7.2
Wall mounting
The assembly set contains:
EAA
GB
after
cutting
to
19