SICO 3 Serie Manual Del Propietário página 12

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

BRIDGE & WEDGE SECTION INSTALLATION
The bottom two sections of the ramp are the
bridge section and the wedge section.
1. Tilt the bridge section off the ramp caddy so
the bridge section is resting on all four
connector brackets that are mounted near
the four corners. See Figure 1.
2. Lift one edge of the bridge section and insert
the two brackets into the brackets on the
bottom edge of the lowest folding leg ramp
section or the upper clamp of a landing or
turnaround. See Figure 2.
3. Place the wedge ramp section adjacent to the
bottom edge of the bridge ramp section.
Remove the hitch pins from the holes in the
wedge section connector brackets.
See Figure 3.
4. With one person on each side, lift the low
end of the bridge section while pulling the
wedge section toward the bridge section until
the bridge section brackets contact the
vertical plates of the wedge section and the
lower the bridge section brackets into the
wedge section brackets. See Figure 4.
5. Secure all four corners of the bridge section
by installing the hitch pins. See Figure 5.
FIGURE 1
FIGURE 2
FIGURE 3
FIGURE 4
FIGURE 5
PAGE 12
Tabla de contenido
loading

Productos relacionados para SICO 3 Serie

Tabla de contenido