Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Before operation, assemble the nozzle and sprayer hose, then connect the
sprayer hose into the pump chamber.
1. Assemble the nozzle and sprayer hose.
For more information about the nozzle and head type variations, see page 15.
Long distance type:
Be sure to install packings and connect each part securely.
a. Install the 12 mm nut to the nozzle pipe.
b. Connect the nozzle handle into the nozzle pipe.
NOZZLE HANDLE
c. Connect the sprayer hose into the roller joint.
d. Connect the roller joint into the shut-off valve.
e. Connect the shut-off valve into the nozzle pipe.
ROLLER JOINT
SPRAYER HOSE
NOZZLE PIPE
12 mm NUT
NOZZLE PIPE

5. PREPARATION

PACKING
SHUT-OFF VALVE
PACKINGS
23

Capítulos

Tabla de contenido
loading

Tabla de contenido