DRAMINSKI GMM Manual De Uso página 16

Ocultar thumbs Ver también para GMM:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
Having performed these actions you can put the
dosage tube on the measurement chamber of the
meter (on the lower edge of the feeder there is a spe-
cial slant). You should then pull out the slider, which
will cause the sample to fall into the measurement
chamber.
ATTENTION
While pouring the seeds you should pull out
the slider with a steady, but decided movement
which lasts about 1 second.
Upper edges of the measurement chamber (red
elements) should be completely covered by
seeds after filling.
e) Having filled the measurement chamber you
should not move or shake the device. You should
only press the button „OK".
Under the name of the sample there will be the in-
formation: „analysing" displayed. After a short
time the result of the measurement will be shown –
the percentage of humidity and temperature in C
degrees. (the final humidity reading will appear
after the temperature's influence is taken into ac-
count).
f ) After measurement you should empty the cham-
ber and press „OK" button.
The command „pour in seed" will be displayed. It
means, you can repeat the measurement for the same
sample or check the humidity for another sample (of
the same species).
g) To choose another species (another name of the
sample) you should press the button „CAL/
h) After finishing measurements the tester should be
turned off by pressing „ON/OFF" button.
If the tester is not being used, it will turn off auto-
matically after 3 min.
ATTENTION
Please remember, to pour seeds into the meas-
urement chamber only after the command „pour
in seeds" is displayed.
CHAPTER 3 | MEASUREMENT
".
CANCEL
EN
15
loading