GB
May we congratulate you on your new Greenhouse
Dear Customer!
The assembly of your new greenhouse requires no
technical knowledge. However, it is important that
the assembly instructions are strictly followed. The
assembly instruction is a combination of text and
illustrations. The profiles are packed separately in
numbered packs corresponding to the order in the
assembly instruction. Erect one pack at a time. All
nuts bolts and fittings are found in bag No. 0
(specified on page 12). Each pack is specified in
separate lists of components.
All detailed illustrations are marked with symbols:
Seen from inside
Seen from outside
Precautions.
Assembly must be carried out in dry, calm
weather.
Always use working gloves while glazing.
Greenhouse glass has sharp edges,
especially if it breaks.
Assistants and especially children must
be warned broken glass is an element of
danger. Pick up broken glass at once and
remove with care.
We recommend to use protective glasses
while fixing spring wire glazing clips.
Place the ladder on a level support.
It is essential to have an assistant.
References.
The column marked
indicates the page(s)
on which the component is used.
Page 13 - 14:
Foundation
If you are not using the pre-fabricated base for this
greenhouse, you must have an alternative base to
raise the frame off the ground, otherwise the door
will not run correctly. If you are making your own
base, the measurements indicated must be external
measurements. We recommend 19mm x 32mm
pressure treated timber for DIY base, also for wall
battens .
For the pre-fabricated base, you furthermore need
about 75 litres of concrete and 4 or 6 (depending on
the size of greenhouse) plastic concrete pipes of
about 800mm which are placed in a non-freezing
depth for the fastening of the corner and/or middle
anchors.
The base must be 100% level and square; the latter
is
ensured
by
checking
the
measurements are equal.
For the pre-fabricated base on a solid foundation
i.e. concrete pad, slabs or sleepers, the ground
anchors will need to be cut to the height of the
base with a hack saw as they are also corner
bracket ( s.
Tools
The mounting of the greenhouse requires the tools
shown on page 12.
Pages 14-30:
Place the components as shown on the illustration
and assemble in the order shown in the pictures. Do
not tighten the nuts completely until the front gable
construction has been assembled.
Fitting of glass/polycarbonate
Important before glazing!
Make sure that the gables and sides are level and
square, and that the door(s) and window(s) are
functioning perfectly.
Best order of assembly:
1) Rear gable – 2) Front gable – 3) Sides –
4) Frame assembly – 5) Roof and bracing
6) Doors – 7) Vents – 8) Glazing
m m
13
Pages 26-29:
Glazing
Fit glazing strip (411) to all glazing bars, gable
bars and corner posts (vertical bars) before you
begin to glaze the greenhouse.
Start glazing the roof first (working from the
bottom up for horticultural glass), one pane at a
time.
Spring wire clips and glass holder clips are to be
fitted as shown.
= Spring wire clips, = Glass holder clips
X
Page 30:
Mounting of Polycarbonate
The illustrations on page 32 show where to mount
them. The type indication states the length in mm.
A possible adjustment is made by means of a fine-
tooth saw.
NB! To avoid the formation of algae the
polycarbonate sheets must not come into contact
with the ground. Rest them on a piece of
cardboard.
J, K, L, M – lists are mounted as shown on page 30.
two
diagonal
Sealing of the polycarbonate sheets
The sheets may be sealed against insects. Close the
top-end off with alu-tape (NOT SUPPLIED) or
silicone (NOT SUPPLIED).
The bottom only with airstrip tape (NOT SUPPLIED)
to let condensation out.
Now your greenhouse is completely assembled.
However, please notice the following:
Maintenance
Winter Protection
In areas with occurrence of snow we recommend
the following winter protection.
x
723
Insurance
Please note that not all insurance companies cover
greenhouses automatically. Please contact your
insurance company to ensure an insurance coverage.
Guarantee
The greenhouse frame only, has a guarantee of 12
years
components.
The guarantee does not cover glass, polycarbonate,
assembly, freight etc.
There is a 2 year guarantee on painted parts, if any.
Note that marks in the painting may occur due to
suspension of the profiles.
The guarantee is invalid if the greenhouse is not
assembled according to these instructions.
Complaints
All our greenhouses are built to high standards of
quality. However, should a complaint occur, please
contact your dealer at once. Remember to specify
the defect by indicating the greenhouse model and
number of the component, and if possible, the
quality control number.
USA
Grease doors (hinges and lock or door
track).
Clean the gutter for leaves, etc.
Adjustment of windows.
Replacement of broken glass.
Clean the greenhouse with disinfectant
before and after the growing season.
Support the roof ridge at the centre of
the greenhouse.
Remove greater snow loads from the
roof.
Take precautions against snow falling
down from a tree for instance, or a roof.
Dismount the cylinders for the automatic
window openers, if any (optional extras).
Secure door(s) and window(s) preventing
wind damage to the greenhouse.
which
covers
replacement
of
(
faulty