IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should always be
followed including the following:
READ AND FOLLOW ALL SAFETY INSTRUCTIONS
1.
DANGER- Risk of shock- Disconnect power before installation.
DANGER – Risque de choc – Couper l'alimentation avant l'installation.
2.
This luminaire must be installed in accordance with the NEC or your
local electrical code. If you are not familiar with these codes and
requirements, consult a qualified electrician.
Ce produit doit être installé conformément à NEC ou votre code
électrique local. Si vous n'êtes pas familier avec ces codes et ces
exigences, veuillez contacter un électricien qualifié.
3.
Suitable for Damp Locations.
Convient aux emplacements humides.
4.
Access above ceiling required. Do not install insulation within 3 inches (76
mm) of any part of the luminaire. Suitable for suspended ceilings.
Acces requis au-dessus du plafond. Ne pas mettre l'isolant a moins de 76
mm (3 po) de toute partie du luminaire. Convient aux plafonds suspendus.
5.
Do not handle energized module with wet hands or when standing on wet or
damp surfaces, or in water
SAVE THESE INSTRUCTIONS FOR FUTURE
REFERENCE
• The ZR Series of recessed troffers
is for non-insulated ceiling
applications using T-Bar ceiling
grid, drywall grid adaptors, and
suspended mount.
• Designed for use in 120-277V
50-60 Hz or 347V 60Hz protected
circuit (fuse box, circuit breaker).
Supply wire sized as per NEC or
governing code(s), 90C rated.
TO INSTALL:
1
T-Bar Clips
2
1 of 3
• Make sure to cap off all unused
leads.
• Lens and removable end cap may
shift during installation. Press
center of lens to engage magnet
strip and push the end cap against
the end panel to eliminate the gap
after installation.
T-Bar Clips bent
upward, rotated
outward, and engaged
with the grid
Architectural Troffers with Removable Lens
ZR14™
ZR22™
ZR24™
T-Bar Clip Hole
ZR Series
Includes: ZR14™, ZR22™ and ZR24™
INSTALLATION INSTRUCTIONS
INSTRUCTIONS D'INSTALLATION
T- BAR CEILING MOUNTING
STEP 1:
Bring the ZR troffer into the T-bar
ceiling panel. See Figure 1 for location
of the T-bar clips on end panels of
troffer.
STEP 2:
Bend clips upward and rotate outward
to engage with T-bar support grid. See
Figure 2. Secure luminaire to grid in
compliance with state and local codes.
SUSPENDED MOUNTING
STEP 1:
Attach customer supplied cables to the
(4) T-bar clips located in the corners of
the housing. See Figure 1.
NOTE: The hole in each clip should be
used to attach the cable
STEP 2:
Attach cables to mounting surface using
customer supplied hardware. Ensure
that mounting surface can support the
luminaire.
LPN00678X0001A0_A