Operator Safety Instructions - GAYNER ECI Serie Instrucciones De Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SET-UP AND WORKING AREA SAFETY
Prior to set-up, be aware of and avoid the following hazardous situations:
· Drop-offs or holes which impede the tower being levelled using only the leveling jacks. Pot holes, obstacles on the
floor or debris.
· Slopes that exceed the adjustment capabilities of the tower.
· Unstable or slippery surfaces.
· Hazardous locations. Aerial obstacles or overhead electric cables.
· Inadequate surface support to withstand all load forces imposed by the tower.
· Weather conditions and strong winds.
· The presence of unauthorised personnel.
14

OPERATOR SAFETY INSTRUCTIONS

· Do not stand under or allow personnel under the ECI tower when the load is raised, making sure
a safety area is blocked around the tower, which should have a diameter of 1.5 times the height
of the tower..
· Do not lower the load unless the area below is clear of personnel and obstructions.
· Never use the ECI lifting tower in strong or gusty wind.
· Do not use this lifting tower outdoors if it is thundering and lightning or adverse weather...Never
use the ECI tower in the event of extreme weather conditions.
NOTE: Increasing the load surface area will decrease machine stability in windy conditions.
· Avoid transporting the ECI lift over uneven surfaces or ground with debris when in the folded
position.
· Never use the tower on moving surfaces or vehicles.
· The ECI lift must always be set up on firm and even surfaces.
· This ECI lifting tower is not electrically insulated and does not protect you if it gets close to or
comes into contact with electricity.
· If the ECI tower comes into contact with electric cable, keep well away. The tower should not be
touched or used until the electricity has been switch off.
· Maintain safe distances away from electrical power lines and apparatus, allowing for mast
movement and electrical line sway or sag, in accordance with applicable local governmental
regulations.
· Do not use the lifting tower as a ground for welding.
· Before installing the tower, make sure the installation area can hold a minimum point load of 5
times the load to be raised.
NOTE: When using this lifting tower in public places or industrial areas, a series of safety
instructions have to be followed that this manual can only give in part. The user must therefore
inform himself/herself on the current governmental safety instructions and take them into
consideration when planning the installation
Tabla de contenido
loading

Tabla de contenido