Chapter Eight Equipment Installation - SATA AE5603 Manual Del Uso

Alineador de cuatro ruedas 3d de 3,5 toneladas
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 254
AE5603
EN
DE
RU
KO
PT
JA
ES
Chapter Eight Installation
Firstly, Connect upper column and lower column in the ground, and then install beam on fixed hole on the upper column
firmly with screws. Erect the equipment on installing position and fixed by screws.
Base requirement:
1. Concrete,drying period is 20 days.
2. Concrete area≥ 1m².
3. Concrete thickness >200mm.
4 .Concrete horizontality≤ 2mm
65
- 03 -
Tabla de contenido
loading

Tabla de contenido