3
Trim Installation
A.
3
4
5
Escutcheon Installation
For finished walls up to 1 1/8". Install trim sleeve
(1) over valve cartridge (7) and bonnet. Secure
backplate (2) to rough-in body using 4 screws (3)
provided.
Note: Be sure backplate is oriented front side
forward and markings are visible.
Holding escutcheon (5) in place, thread trim nut (4)
onto diverter sleeve (6).
Note: For thick wall installations, order
installation kit RP90544 to support finished
wall thickness up to 2 1/8".
On rough or uneven surfaces it is necessary
to apply caulk around the backplate (2) to
supplement the seal. Do not caulk the drip notch
in the bottom of the backplate (2). Do not caulk
the escutcheon (5).
Installation and Adjustment of the Temperature Knob
Failure to do so may cause injury.
C.
3
2
1
4
Adjust temperature limit stop
Turn on water supplies; LET THE WATER RUN AT
BOTH FULL HOT AND FULL COLD TO ENSURE
THE WATER IS RUNNING AS HOT/COLD AS
POSSIBLE. Place a thermometer in a plastic
tumbler, and hold the tumbler in the water stream.
Place the temperature knob (1) onto the splines (2),
then rotate the temperature knob until you achieve
your maximum desired temperature from the outlet
6
2
1
3
B.
1
7
Volume Handle Installation
Install valve handle (1) over cartridge (4), screw in
set screw (2) using a allen wrench.
Place set screw cover (3) over set screw and apply
pressure until cover is properly seated.
4
(not more than 120° or the lower temperature
mandated by your local plumbing code). Remove
the temperature knob and replace onto the splines
(2), making sure that the temperature knob limit
stop (3) hits against the volume handle limit stop (4)
as shown.
5
Installation
3
2
4
3
84893 Rev. C