Lay wall jamb on a flat surface.
Wall Jamb
Channel Lip
3. Install the Adjustment Blocks
Slide three adjustment block assemblies into the channel of the wall jamb.
Position each block over the holes located between the two grooves.
Secure the blocks by holding them in place and crimping the wall jamb channel lip on both sides of
the block (four places).
Press down firmly with a screwdriver blade to crimp the wall jamb channel lip. Tap the screwdriver
with a hammer if necessary.
Use a Phillips screwdriver to turn the adjustment screws until they are all the way into the
adjustment blocks. Do not adjust the screws past flush.
Repeat the procedure with the other wall jamb.
4. Install the Door Panel
Place the wall jambs into the expander jambs.
Carefully position the door on the shower floor ledge and center the door within the opening.
Line the wall jambs up with the pencil marks on the wall.
Sterling
Adjustment
Screw
Wall Jamb
Adjustment
Block
5
1034027-2-B